Monday, September 1, 2014

Moving In

Moving in day was rather stressful, we rolled out the left over floor insulation over the floor and advised the removalists to "stick to the yellow brick road" however they seemed more interested in getting the job done as quick as possible than protecting our floorboards (which is something I don't understand as we were paying them per hour)! Despite our best efforts to keep the floors covered up we did end up with a few scratches, thankfully the guys from carpet court were able to come out and repair them quite easily.

 Hubby taking a well deserved break on the "yellow brick road"



Not long after we had moved in I was at work and received a phone call from my dad. I immediately wondered what was wrong as he never calls me during the day, he was just calling to let me know he had arranged for our driveway to be poured AND PAID FOR!! Thank you so much Dad! We selected Boral Brown Rock Exposed Aggregate concrete.




Merbu Portico Deck

Built by Flawless Landscaping



Entry, this is a better representation of the colour of our Bamboo Floor boards. 



We were planning to buy all new furniture and have it delivered before we moved in but we hadn't found what we were looking for so we ended up moving all of our existing furniture (bits and pieces that we have collected over the years). 

We have since selected some beautiful furniture in a local shop that we both love (the feature, a 10 seater extension dining table), we are just waiting for it to go on sale. 

You will use your imagination and picture our house with nice modern furniture, here are are a few photos of our house being lived in for the mean time :)

Meals & Family



Family Room



Beautiful bush views and furry visitors, the view from inside our family room.



A cheeky visitor checking out the new veggie patch! 


The Uber Nerd Study and my wonderful Husband (thrilled about having his photo taken!). We have ordered timber plantation shutters (painted white) to section the study off from the main living area, mostly to hide our messy desks and reduce some of the noise between the rooms. 


We bought these paintings while travelling around Egypt 4 years ago and have only just had them framed. They fit perfectly in this space. 




Laundry - We will keep my old washing machine until it gives up the ghost and then replace it with a front loading washing machine with a timer so we can take advantage of the free power from our solar panels during the day.  We love the finish of the 600 x 600 tiles. 




Laundry Art, because everyone needs something pretty to look at while doing the washing!



Master bedroom.

My husband and I both work in IT and neither of us are very "handy" but we attempted a DIY curtain rod installation to get us by until our drapes are professionally installed. We failed to secure it to the timber so now it's just hanging there by the plaster. We will need to get the plaster repaired and repainted before our curtains are installed (within the next few weeks I hope as I expect it to come crashing down at any given moment!).


DIY Fail


Bedroom 2  "The Ironing room" This room receives the most afternoon sun (west facing), it's toasty and warm so we usually hang our washing in here to dry. 




Bedroom 4 - Bedroom 3 is next door and is exactly the same layout. 


Now that we are all settled in and Spring has arrived, it's time to start the landscaping!  Check back over the next couple of months for more photos, I'll also write a blog about our curtain choices and post some photos once they have been installed. 


Saturday, August 16, 2014

Hand Over

It took around 3 weeks from the completion of building to handover, I think this stage would have dragged on for another week except I had booked our floor installation a week early to hurry things along.






Entry
For the entry, kitchen, family and meals area we selected Genesis Bamboo floor boards in colour "Carbonised". We arranged with the builder for the skirt boards to be laid after the floorboards for a more professional finish (to avoid running scotia around the skirt boards).




Family
The photo does not represent the actual colour of the floor boards, they are much lighter in real life.


Kitchen
We ordered a Meile 5500 SCU CS dishwasher, I have wanted to own another Meile since selling my previous house 10 years ago. 


Kitchen & Meals
Study to the left, we plan to install plantation shutters to section the rooms off. 


Ensuite
We absolutely love the finish of the 600 x 600 porcelain tiles. 






Bedroom 4 (Carpet still being installed)

We selected Quest Aurora solution died nylon carpet with Air Stepmax underlay for the 4 bedrooms and study. 

Fixing Stage

Sorry to anyone that was reading but it appears I abandoned this blog prior to fixing stage. In the name of finishing all things I start here are some photos from the fixing stage (January-February).

Meals & Family



Kitchen  - We love the feature benchtop with 100mm ceaserstone to the rear.



 Study


Main Bathroom


Master Bedroom


WIR Fitout


Entry


Cat 6 termination in walk in linen press. 









Friday, February 14, 2014

Bricks and Lockup

I'm a bit behind in updating this blog, Chrismas / New Years / Life got busy!

Here are some pics from Lockup Stage (December)